Actions

Information system

From EPC Standard

Revision as of 14:10, 15 January 2021 by EPCStandardAdmin (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)


Information system
Graphical Notation
There is no image yet, do you want to upload one?
IsSubClassOf IsSubClassOf::Resource
Successors hasSuccessor::Information system
Predecessors hasPredecessor::Information system
HasIncomingControlFlow hasIncomingControlFlow::0
HasOutgoingControlFlow hasOutgoingControlFlow::0
HasResource hasResource::0
HasAttribute hasAttribute::0
Edit the Properties


Brief Information

This is an autogenerated section!

You are not able to edit this information by hand, but by edit the Form (and therefore the properties) of this page. Please refer to the Edit the properties link at the bottom of the info box. {{#show: Information system | ?Is a | Intro=The Information system is a }}. {{#show: Information system | ?contains | Intro=It contains }}. {{#show: Information system | ?hasSuccessor | Intro=Possible succeeding element(s) is/are  }}. {{#show: Information system | ?hasPredecessor | Intro=Previous element(s) can be }}. {{#show: Information system | ?hasIncomingControlFlow | Intro=The cardinalities are  | Outro= (incoming)}} {{#show: Information system | ?hasOutgoingControlFlow | Intro=and  | Outro= (outgoing) respectively }}. {{#show: Information system | ?refersTo | Intro=The Information system refers to }}. {{#show: Information system | ?attachedTo | Intro=The Information system is attached to a }}.


Syntax

An information system is an additional resource that is added to a function by a straight line without arrow. [1]

Relation type

An information system is connected to a function by an input output flow connector. [2]

Extensions

iEPC. [3]

References


  • [*1] G. Decker and W. Tscheschner, “Migration von EPK zu BPMN,” EPK 2009. 8. Work. der Gesellschaft für Inform. e.V. und Treffen ihres Arbeitkreises "Geschäftsprozessmanagement mit Ereignisgesteuerten Prozessketten (WI-EPK). Gesellschaft für Inform., pp. 91–109, 2009.
  • [*2] B. Korherr and B. List, “A UML 2 Profile for Event Driven Process Chains *,” vol. 205, pp. 161–172, 2006.
  • [*3] L. Rosa, H. M. Arthur, M. La, and M. Dumas, Configurable Multi-Perspective Business Process Models. 2010.