Jump to: navigation, search

Difference between revisions of "EPC Modelling Resources"


Line 4: Line 4:
  
 
[[File:EPC Modelling resources.jpg|frameless|center]]
 
[[File:EPC Modelling resources.jpg|frameless|center]]
''Figure 3.  EPC resources''
+
''Figure 5.  EPC resources''
  
 
== References ==
 
== References ==

Revision as of 12:57, 12 September 2017

Short description

For EPC resources, we adhere to common ground in the EPC literature and therefore only account for three resource types. The resource phase as depicted in Figure 5 is straightforward and splits the decision process into three paths, each for a specific resource type. Hence, the modeller identifies the required resource in the process description and assigns the resource object to the function. Afterwards, the user is guided towards the event phase.

EPC Modelling resources.jpg

Figure 5. EPC resources

References


  • [1] Jannaber, S., Riehle, D., Delfmann, P., & Thomas, O. (2017). HELP IS ON THE WAY–PROVIDING USER SUPPORT FOR EPC MODELLING VIA A SYSTEMATIC PROCEDURE MODEL.